Expired Standard Drawings

Design Criteria and Standard Drawings Announcement

The Department of Transportation has extensively updated our design criteria manual and construction standard drawings.

The revised Design Criteria and Standard Drawings became effective on May 1, 2020. Projects submitted prior to the effective date may use the expired criteria on this page or adopt the new policies.

The current construction standard drawings can be found here: Construction Standard Drawings



The Following Expired May 1, 2020


 Publication

Description

Revision Date

Expiration Date

Complete Book

Complete Standard Drawings Book

9/1/2015

5/1/2020

       


Drawing #


Description of Individual Standard Drawings


Revision Date
 


Expiration Date
 

 Cover  Standard Drawings Cover Sheet

9/1/2015 

5/1/2020

 TOC  Standard Drawings Table of Contents

9/1/2015 

5/1/2020

 Errata  Standard Drawings Errata Sheet

9/1/2015 

5/1/2020

 C203.02  Typical Details Undergrading

7/31/2007 

5/1/2020

 C203.20  Super-elevation (Straight Line Method)

6/17/2008 

5/1/2020

 C203.54  Street Intersection Platform

7/31/2007 

5/1/2020

 C203.60  Standard Typical Section - Arterial Road
     (70' R/W - 24' Pavement)

3/1/2010 

5/1/2020

 C203.61  Standard Typical Section - Arterial Road
     (60' R/W - 39' Pavement)

3/1/2010 

5/1/2020

 C203.62  Standard Typical Section - Arterial Road
     (70' R/W - 39' Pavement)

3/1/2010 

5/1/2020

 C203.63  Standard Typical Section - Arterial Road
     (72' R/W - 51' Pavement)

3/1/2010 

5/1/2020

 C203.64  Standard Typical Section - Arterial Road
     (84' R/W - 63' Pavement)

3/1/2010 

5/1/2020

 C203.65  Standard Typical Section - Arterial Road
     (84' R/W - 36' Pavement)

3/1/2010 

5/1/2020

 C203.66  Standard Typical Section - Road Improvement Requirements
     for Chesterfield Valley Area

3/1/2010 

5/1/2020

 C203.67  Standard Typical Section - Road Improvement Requirements
     for Chesterfield Valley Area

3/1/2010 

5/1/2020

 C203.68  Standard Typical Section - Road Improvement Requirements
     for Chesterfield Valley Area

3/1/2010 

5/1/2020

 C203.70  Standard Typical Section - County Road
     (70' R/W - 24' Pavement)

1/1/2010 

5/1/2020

 C203.71  Standard Typical Section - County Road
     (60' R/W - 39' Pavement)

1/1/2010 

5/1/2020

 C203.72  Standard Typical Section - County Road
     (70' R/W - 39' Pavement)

1/1/2010 

5/1/2020

 C203.75  Standard Typical Section - Wide Outside Lane
      for Bicycles
 

4/1/2013 

5/1/2020

 C203.80

 Standard Typical Section - Residential Street
     (34' R/W - 20' Pavement) (Type 1 & Type 2)

3/1/2010 

5/1/2020

 C203.81  Standard Typical Section - Residential Street
     (34' R/W - 20' Pavement) (Type 3 & Type 4)

3/1/2010 

5/1/2020

 C203.82  Standard Typical Section - Residential Street
     (50' R/W - 26' Pavement) (Type 1 & Type 2)

1/1/2010 

5/1/2020

 C203.83  Standard Typical Section - Residential Street
     (50' R/W - 26' Pavement) (Type 3 & Type 4)

1/1/2010 

5/1/2020

 C203.84  Standard Typical Section - Residential Street
     (60' R/W - 38' Pavement) (Type 1 & Type 2)

1/1/2010 

5/1/2020

 C203.90  Standard Typical Section - Non-Residential Street
     (40' R/W - 27' Pavement) (Type 1 & Type 2)

1/1/2010 

5/1/2020

 C203.91  Standard Typical Section - Non-Residential Street
     (50' R/W - 39' Pavement) (Type 1 & Type 2)

1/1/2010 

5/1/2020

 C203.92  Standard Typical Section - Non-Residential Street
     (60' R/W - 51' Pavement) (Type 1 & Type 2)

1/1/2010 

5/1/2020

 C204.00  Embankment Control Measuring Devices

7/31/2007 

5/1/2020

 C404.13  Detail of Butt Joint

7/31/2007 

5/1/2020

 C502.00

 Pavement Construction Details - Concrete Pavement and
     Base Appurtenances

7/31/2007 

5/1/2020

 C502.01  Pavement Construction Details - Integral Vertical Curb and
     Concrete Pavement Typical Sections & Details

10/1/2012 

5/1/2020

 C502.02  Pavement Construction Details - Integral Rolled Curb and
     Concrete Pavement Typical Sections & Details

10/1/2012 

5/1/2020

 C502.03  (Deleted - Replaced by C502.13 and C502.14)

 

5/1/2020

 C502.04  Pavement Construction Details - Bituminous Concrete Curb
     and Pavement Details

1/1/2010 

5/1/2020

 C502.05  Pavement Construction Details - Residential
     Temporary Turnaround

10/1/2012 

5/1/2020

 C502.06  Pavement Construction Details - Residential Street,
     42' Radius Turnarounds, 54' Radius Right-of-Way
     (Types 1, 2, 3 & 4 With Center Islands)

10/1/2012 

5/1/2020

 C502.07

 Pavement Construction Details - Residential Street,
     42' Radius Turnarounds, 54' Radius Right-of-Way
     (Types 5, 6 & 7 With Center Islands)

4/28/2009 

5/1/2020

 C502.08

 Pavement Construction Details - Residential Street,
     42' Radius Turnarounds, 54' Radius Right-of-Way
     (Types 9, 10 & 11 Without Center Islands)

1/1/2010 

5/1/2020

 C502.09

 Pavement Construction Details - Residential Street, 55' Radius
     Turnaround, 55' Radius Right-of-Way With 7' Easement or
     67' Radius Right-of-Way (Type 8 With Center Island)

1/1/2010 

5/1/2020

 C502.10

 Pavement Construction Details - Non-Residential Street,
     55' Radius Turnaround, 61.5' Radius Right-of-Way With
     5' Easement (Without Center Island)

1/1/2010 

5/1/2020

 C502.11

 Pavement Construction Details - Dowel Supporting Units,
     Approved for Use With Transverse Joints (Type A & Type B)

10/1/2012 

5/1/2020

 C502.12

 Pavement Construction Details - Lane Development Along
     Existing Arterial Roadways With Parking Lane

8/1/2013 

5/1/2020

 C502.13

 Pavement Construction Details - Joints

10/1/2012 

5/1/2020

 C502.14  Pavement Construction Details - Curbs

10/1/2012 

5/1/2020

 C503.00

 Pavement Construction Details - Concrete Approach Slab
     and Appurtenances to Bridges

7/31/2007 

5/1/2020

 C503.01

 Pavement Construction Details - Concrete Approach Slab
     and Appurtenances to Bridges

7/31/2007 

5/1/2020

 C504.00

 Pavement Construction Details - Concrete Approach Pavement
     and Appurtenances to Bridges

7/31/2007 

5/1/2020

 C504.01

 Pavement Construction Details - Concrete Approach Pavement
     and Appurtenances to Bridges

7/31/2007 

5/1/2020

 C603.10

 Water Main Installation and Water Service Connection

7/31/2007 

5/1/2020

 C603.20

 Residential Irrigation and Sprinkler Head Location
     (With Sidewalks)

7/31/2007 

5/1/2020

 C603.21

 Residential Irrigation and Sprinkler Head Location
     (Without Sidewalks)

7/31/2007 

5/1/2020

 C604.20

 Sewer Construction Details - Adjusting Grate Inlets

7/31/2007 

5/1/2020

 C604.30

 Sewer Construction Details - Concrete Manholes

7/31/2007 

5/1/2020

 C604.31

 Sewer Construction Details - Street and Area Inlets

7/31/2007 

5/1/2020

 C604.32

 Sewer Construction Details - Grate Inlets

7/31/2007 

5/1/2020

 C604.33

 Sewer Construction Details - Grate Inlet in Ditch

1/1/2010 

5/1/2020

 C604.34

 Sewer Construction Details - Canted Inlets

7/31/2007 

5/1/2020

 C604.35

 Sewer Construction Details - Double and Multiple Inlets

7/31/2007 

5/1/2020

 C604.36

 Sewer Construction Details - Street Inlet Sumps

7/31/2007 

5/1/2020

 C604.37

 Sewer Construction Details - Manholes

7/31/2007 

5/1/2020

 C604.38

 Sewer Construction Details - Manhole and Drop Structure

7/31/2007 

5/1/2020

 C604.39

 Sewer Construction Details - Grated Trough (Cast Iron)

7/31/2007 

5/1/2020

 C604.40

 Pavement Construction Details - Pavement Lugs

10/1/2012 

5/1/2020

 C604.41

 Sewer Construction Details - Channels, Collars &
     Large Sewer Connections

7/31/2007 

5/1/2020

 C604.42

 Sewer Construction Details - Small Sewer Connections

7/31/2007 

5/1/2020

 C604.43

 Sewer Construction Details - Pipe Collars

7/31/2007 

5/1/2020

 C604.44

 Sewer Construction Details - Precast Concrete
     Stormwater Structures

7/31/2007 

5/1/2020

 C604.45

 Sewer Construction Details - Modified Inlet Sumps

7/31/2007 

5/1/2020

 C604.46

 Sewer Construction Details - Inlet with Exposed
     Aggregate Sidewalk

7/31/2007 

5/1/2020

 C605.10

 Sewer Construction Details - Class A Underdrains

7/31/2007 

5/1/2020

 C606.01

 Guardrail Construction Details - Guardrail

5/5/2014 

5/1/2020

 C606.02

 Guardrail Construction Details - Guardrail

5/5/2014 

5/1/2020

 C606.03

 Guardrail Construction Details - Guardrail

5/5/2014 

5/1/2020

 C606.04

 (Standard Drawing Deleted)

 

5/1/2020

 C606.05

 Guardrail Construction Details - Guardrail

5/5/2014 

5/1/2020

 C606.06

 Guardrail Construction Details - Guardrail

5/5/2014 

5/1/2020

 C606.07

 (Standard Drawing Deleted)

 

5/1/2020

 C606.20

 Guardrail Construction Details - Bridge Anchor Section
     (Brush Curb)

5/5/2014 

5/1/2020

 C606.21

 (Standard Drawing Deleted)

 

5/1/2020

 C606.22

 Guardrail Construction Details - Bridge Anchor Section
     (Safety Barrier Curb)

5/5/2014 

5/1/2020

 C606.23

 Guardrail Construction Details - Bridge Anchor Section
     (Thrie Beam Rail on Bridge)

5/5/2014 

5/1/2020

 C606.31

 Guardrail Construction Details - Crashworthy Guardrail Terminal,
     50'-0" System (Drawing Removed on 11/19/2014)

  11/19/2014 

5/1/2020

 C606.32  Guardrail Construction Details - Crashworthy Guardrail Terminal,
     37'-6" System (Drawing Removed on 11/19/2014)

  11/19/2014 

5/1/2020

 C606.33  Guardrail Construction Details - Crashworthy Guardrail Terminal,
     25'-0" System (Drawing Removed on 11/19/2014)

  11/19/2014 

5/1/2020

 C607.10

 Chain-Link Fence

7/31/2007 

5/1/2020

 C607.11

 Chain-Link Fence

7/31/2007 

5/1/2020

 C607.12

 Chain-Link Fence for Retaining Walls

7/31/2007 

5/1/2020

 C607.13

 Aluminum Handrail for Retaining Walls

7/31/2007 

5/1/2020

 C607.15

 Chain-Link Fence on Structure

7/31/2007 

5/1/2020

 C607.20

 Woven Wire Fence

 7/31/2007

5/1/2020

 C607.25

 Overpass Safety Chain-Link Fence

 7/31/2007

5/1/2020

 C608.00

 Entrance Construction Details - Residential Concrete Entrances

 10/1/2009

5/1/2020

 C608.01

 Entrance Construction Details - Commercial Concrete Entrances

 10/1/2009

5/1/2020

 C608.02

 Entrance Construction Details - Type 1 & Type 2
     Special Commercial Concrete Entrances

 10/1/2009

5/1/2020

 C608.03

 Entrance Construction Details - Residential
     Bituminous Concrete Entrance

 10/1/2009

5/1/2020

 C608.04

 Entrance Construction Details - Residential
     Driveway Entrances with Culvert

 10/1/2009

5/1/2020

 C608.05

 Entrance Construction Details - Type 1 & Type 2
     Special Commercial Bituminous Concrete Entrances

 10/1/2009

5/1/2020

 C608.06

 Entrance Construction Details - Bituminous Concrete Entrance
     Connection to Existing Concrete Pavement with Integral Curb

 10/1/2009

5/1/2020

 C608.07

 Pavement Construction Details - Street Intersection Approach

     (Large Lot Subdivision)

 10/1/2009

5/1/2020

 C608.08

 Pavement Construction Details - Standard Residential
     Street Entrance

 10/1/2009

5/1/2020

 C608.09

 Pavement Construction Details - Median and Intersection
     Configuration

 1/1/2010

5/1/2020

 C608.10

 Entrance Construction Details - Guidelines For Joint Filler
     Installation

 10/1/2009

5/1/2020

 C608.20

 Pavement Construction Details - Right In / Right Out Channelized
     Street or Commercial Entrance (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.21

 Intersection Channelization Details - Right In / Right Out
     Channelized Street or Commercial Entrance
     (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.22

 Intersection Channelization Details - Interim Right In / Right Out
     Channelized Street or Commercial Entrance
     (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.23

 Intersection Channelization Details - Residential Street
    38' Wide Exclusive Right Turn Lane (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.24

 Intersection Channelization Details - Residential Street
    38' Wide Exclusive Left Turn Lane (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.25

 Intersection Channelization Details - Collector Road
    39' Wide Exclusive Right Turn Lane (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.26

 Intersection Channelization Details - Collector Road
    39' Wide Exclusive Left Turn Lane (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.27

 Intersection Channelization Details - Arterial Road
    63' Wide Exclusive Left Turn Lane (Concrete Pavement)

 4/6/2012

5/1/2020

 C608.30

 Intersection Channelization Details - Right In / Right Out
     Channelized Street or Commercial Entrance
     (Bituminous Concrete Pavement)

 4/6/2012

5/1/2020

 C608.31

 Intersection Channelization Details - Collector Road
     39' Wide Exclusive Right Turn Lane
     (Bituminous Concrete Pavement)

 4/6/2012

5/1/2020

 C608.32

 Intersection Channelization Details - Collector Road
     39' Wide Exclusive Left Turn Lane
     (Bituminous Concrete Pavement)

 4/27/2012

5/1/2020

 C608.33

 Intersection Channelization Details - Arterial Road
     63' Wide Exclusive Left Turn Lane
     (Superpave Asphaltic Concrete Pavement)

 4/6/2012

5/1/2020

 C608.34

 Intersection Channelization Details - Right In / Right Out
     Channelized Street or Commercial Entrance
     (Asphaltic Concrete or Bituminous Concrete Pavement)

 4/6/2012

5/1/2020

 C608.35

 Intersection Channelization Details - Interim Right In / Right Out
     Channelized Street or Commercial Entrance
     (Asphaltic or Bituminous Concrete Pavement)

 4/6/2012

5/1/2020

 C608.36

 Intersection Channelization Details - 4 Inch Raised Concrete
     Channelization Island (With Type 1 Curb Ramp)

 7/1/2010

5/1/2020

 C608.40

 Sidewalk & Curb Ramp Details - Concrete Sidewalk and
     Curb Ramp Details (Types 1 & 2)

 7/1/2010

5/1/2020

 C608.41

 Sidewalk & Curb Ramp Details - Concrete Sidewalk and
     Curb Ramp Details (Types 3 & 4)

 3/1/2010

5/1/2020

 C608.42

 Sidewalk & Curb Ramp Details - Mid-block Sidewalk Ramp
     with Type "1" Curb Ramp (Configuration 1)

 7/1/2010

5/1/2020

 C608.43

 Sidewalk & Curb Ramp Details - Mid-block Sidewalk Ramp
     with Type "3" Curb Ramp (Configuration 2)

 7/1/2010

5/1/2020

 C608.44

 Sidewalk & Curb Ramp Details - Single Curb Ramps
     (Configurations 3, 4 & 5)

 3/1/2010

5/1/2020

 C608.45

 Sidewalk & Curb Ramp Details - Residential Curb Ramp
     (Configuration 6)

 3/1/2010

5/1/2020

 C608.46

 Sidewalk & Curb Ramp Details - Standard Right-of-Way
     (Configurations 7 & 8)

 3/1/2010

5/1/2020

 C608.47

 Sidewalk & Curb Ramp Details - Restrictive Right-of-Way
     (Configurations 9 & 10)

 3/1/2010

5/1/2020

 C608.48

 Sidewalk & Curb Ramp Details - Restrictive Right-of-Way -
     Dual Ramps (Configurations 11 & 12)

 3/1/2010

5/1/2020

 C608.49

 Sidewalk & Curb Ramp Details - Curb Ramp & Cut-Through
     with 4 Inch Raised Concrete Islands (Configurations 13 & 14)

 10/8/2012

5/1/2020

 C608.50

 Sidewalk & Curb Ramp Details - Concrete Sidewalk Details

 3/1/2010

5/1/2020

 C608.51

 Sidewalk & Curb Ramp Details - Detectable Warning Surface
     for New Construction and Retrofitting of Curb Ramps

 7/6/2011

5/1/2020

 C608.55

 Sidewalk Construction Details - Sidewalk, Street Name Signs
     and Monuments

 1/1/2010

5/1/2020

 C608.56

 Sidewalk Construction Details - Mailbox Placement Standards

 6/11/2010

5/1/2020

 C608.57

 (Deleted Standard Drawing)

 

5/1/2020

 C608.60

 Pavement Construction Details - Concrete Steps

 10/1/2009

5/1/2020

 C608.61

 Pavement Construction Details - Raised Doweled-On
     Concrete Median

 10/8/2012

5/1/2020

 C609.15

 Paved Ditches and Gutters

 7/31/2007

5/1/2020

 C611.50

 Heavy Stone Revetment Ditch Liner

 7/31/2007

5/1/2020

 C611.60

 Concrete Slope Protection

 7/31/2007

5/1/2020

 C611.70

 Gabion Walls

 7/31/2007

5/1/2020

 C612.10

 Standard Construction Signs - Traffic Control Devices

 10/8/2012

5/1/2020

 C612.11

 Treatment of Temporary Terminations of Roadway Pavement

 7/31/2007

5/1/2020

 C612.20

 Sand Filled Impact Attenuators

 7/31/2007

5/1/2020

 C613.00

 Construction Details of Full Depth Pavement Repair
     (Cut Sections A Through C)

 10/8/2012

5/1/2020

 C613.01

 Construction Details for Concrete Construction Patches
     (Details A Through D)

 10/8/2012

5/1/2020

 C613.02

 Construction Details for Concrete Repair

 10/8/2012

5/1/2020

 C613.03

 Construction Details for P.C.C. Repair

 10/8/2012

5/1/2020

 C613.04

 Construction Details of Dowel Installation and
     Epoxy Retention Disk
 

 10/8/2012

5/1/2020

 C613.05  Temporary Steel Plate Trench Bridging
 

 1/25/2013

5/1/2020

 C614.10

 Sewer Construction Details - Castings

 7/31/2007

5/1/2020

 C614.11

 Sewer Construction Details - Grates and
     Bearing Plates (Steel)

 7/31/2007

5/1/2020

 C614.30

 Sewer Construction Details - Castings

 7/31/2007

5/1/2020

 C615.00

 Field Office for Resident Engineer

 7/31/2007

5/1/2020

 C617.00

 Concrete Traffic Barrier - Type A & B

 7/31/2007

5/1/2020

 C617.01

 Concrete Traffic Barrier - Type A & B
     (Typical Location Details)

 7/31/2007

5/1/2020

 C617.02

 Concrete Traffic Barrier - Temporary Traffic Barrier 
     Precast Connecting Details

 7/31/2007

5/1/2020

 C702.01

 16" Concrete Piles (Approved Precast Types)

 7/31/2007

5/1/2020

 C702.02

 16" Concrete Piles (Approved Prestressed Types)

 7/31/2007

5/1/2020

 C702.03

 Cast-in-Place Concrete Piles (Approved Types)

 7/31/2007

5/1/2020

 C703.60

 Sewer Construction Details - Concrete Box Structure
     Pipe Inlet

 7/31/2007

5/1/2020

 C706.30

 Reinforcing Bar Supports

 7/31/2007

5/1/2020

 C712.40

 Steel Dams at Expansion Devices for Resurfacing
     Bridge Floors

 7/31/2007

5/1/2020

 C713.30

 Temporary Bridge Rail

 7/31/2007

5/1/2020

 C713.40

 Temporary Concrete Barrier for Stage Construction

 7/31/2007

5/1/2020

 C715.10

 Vertical Drain at End Bents

 7/31/2007

5/1/2020

 C723.00

 Railroad Tie Retaining Wall

 7/31/2007

5/1/2020

 C723.20

 Concrete Retaining Wall

 7/31/2007

5/1/2020

 C725.31

 Sewer Construction Details - Metal Curtain Walls
     and Metal Inlets

 4/28/2009

5/1/2020

 C725.32

 Sewer Construction Details - Aluminum Diaphragms

 7/31/2007

5/1/2020

 C726.30

 Sewer Construction Details - Pipe Bedding

 7/31/2007

5/1/2020

 C726.31

 Sewer Construction Details - Pipe Boring

 7/31/2007

5/1/2020

 C732.00

 Sewer Construction Details - Flared End Section
     (Precast Concrete)

 

 7/31/2007

5/1/2020

 C732.01

 Sewer Construction Details - Flared End Section
     (Metal Pipe)

 7/31/2007

5/1/2020

 C902.10

 Guidelines for Pavement Markings and Lane Striping

 7/31/2010

5/1/2020

 C902.20

 MetroBus Stop / No Parking Sign Installation

 

 12/17/2012

5/1/2020

 C903.10

 Street Name Signs, Details and Locations

 1/1/2010

5/1/2020

 C904.00

 Traffic Signal Details - Traffic Signal Symbols

 11/1/2014

5/1/2020

 C904.10

 Traffic Signal Details - Beam Mount Signal Head Assemblies

 4/8/2013

5/1/2020

 C904.20

 Traffic Signal Details - Top Mount and Side Mount
     Signal Head Assemblies

 11/1/2014

5/1/2020

 C904.30

 Traffic Signal Details - Post With Square Pedestal Base
     and Steel Mast Arm Assembly

 11/1/2014

5/1/2020

 C904.40

 Traffic Signal Details - Controller Cabinet, Fiber Cabinet
     and Power Supply Assemblies

 

 5/5/2014

5/1/2020

 C904.50

 Traffic Signal Details - Concrete Bases

 11/1/2014

5/1/2020

 C904.60

 Traffic Signal Details - Pull Boxes and Conduit Installation

 7/1/2009

5/1/2020

 C904.70

 Traffic Signal Details - Detector Loops

 4/8/2013

5/1/2020

 C904.80

 Traffic Signal Details - Video Camera Mountings

 4/8/2013

5/1/2020

Standard Drawings Archive
Loading...